Homeowner Remodel Checklist

This pre-remodel checklist covers the decisions and specifications that must be addressed before work begins on a remodel designed for chemical sensitivity. It is organized in the order decisions need to be made: scope assessment, contractor screening, material specification, construction-phase air quality planning, and pre-occupancy verification. Each item is actionable — not advice to "consider" but a specific step to complete, document, or verify. Print this checklist or share it with your contractor. The $79 Build Package includes contractor spec packs with the detailed specifications referenced here.

Before You Contact a Contractor

Scope Assessment

Material Decisions (Before Bidding)

Contractor Selection

Before Work Begins

During Construction

Before Re-Occupancy

Last reviewed: August 2026

Report an error