New Construction Checklist

This checklist covers every phase of new construction from site preparation through pre-occupancy verification, organized for homeowners building to the Good Air Standard. Each phase lists the specific items to verify, document, and photograph before the next phase begins. Where build options diverge — wall framing, insulation, sheathing, interior finishes — the checklist notes which steps apply to which options. This is a verification tool, not a building manual. The $79 Build Package includes the complete standard, option-specific spec packs, and the material selection guide that this checklist references.

How to Use This Checklist

This checklist is organized by construction phase. Each phase must be verified before the next phase buries it. The most critical inspection points are those that will be permanently concealed: foundation waterproofing, drainage, framing moisture content, sheathing/WRB continuity, flashing details, and insulation installation quality. Once drywall goes up, these elements cannot be inspected without demolition.

Items marked with a build option tag — [Wood], [AAC], [CMU], [Steel] — apply only to that option. Unmarked items apply to all build options.

Phase 1: Site & Foundation

Phase 2: Framing & Structure

Phase 3: Weather Barrier & Flashing

Phase 4: Insulation

Phase 5: Mechanical Systems

Phase 6: Air Sealing & Pre-Drywall Verification

Phase 7: Interior Finishes

Phase 8: Pre-Occupancy Verification