Contractor Spec Pack

A contractor spec pack is a written specification document that a homeowner provides to their contractor for bidding and building a lower-risk home. It replaces verbal conversations about "healthy materials" with a document the contractor can price, order from, and be held accountable to. The Good Air Standard includes option-specific spec packs covering material categories, approved product types, prohibited materials, construction-phase air quality requirements, and verification checkpoints. Spec packs are included in the $79 Build Package — one pack for each of the 7 build options.

Why Spec Packs Matter More Than Conversations

The single most common failure mode in lower-risk construction is not material selection — it is communication. A homeowner says "I want low-VOC materials." The contractor hears "use whatever the supply house sells as low-VOC." The homeowner expects formaldehyde-free plywood; the contractor installs CARB Phase 2 compliant OSB because the supply house said it was "low-VOC." Both believe they did what was asked. Both are right based on what they understood.

A written specification eliminates this failure mode. The spec pack lists exactly what to use, what not to use, and what to do when a specified product is unavailable. The contractor bids against the document, orders from it, and the homeowner inspects against it. This changes the dynamic from "homeowner asking for special treatment" to "homeowner providing a professional specification" — a dynamic every contractor already understands from commercial work.

What Each Spec Pack Contains

Section 1: Material Specification Table

Every building component in the assembly, organized by construction phase:

Component Specified Category Not Permitted Substitution Rule
Wall sheathing [Per build option: MgO board, exterior gypsum, plywood] OSB Written approval required
Insulation (cavity) Mineral wool batts Spray foam (open or closed cell) Written approval required
Insulation (continuous) Mineral wool rigid boards EPS, XPS, polyiso foam boards Written approval required
Interior wall board Fiberglass-faced gypsum Paper-faced gypsum Written approval required
Primer [Per paint protocol specification] Oil-based primers, PVA primers with high VOC Must meet emissions documentation requirement
Paint [Per paint protocol specification] Products without published emissions data Must meet emissions documentation requirement
Table continues for every component in the assembly. Full tables in $79 Build Package.

Section 2: Prohibited Materials List

Explicit list of materials that must not be used anywhere in the project. Cross-references Materials to Avoid. Key items:

Section 3: Construction-Phase Air Quality Requirements

Summary of the Clean Air Construction Protocol in contractor-actionable format:

Section 4: Verification Checkpoints

Inspection points at each construction phase where the homeowner (or their representative) verifies compliance with the specification. Corresponds to the New Construction Checklist and Homeowner Remodel Checklist.

Section 5: Substitution Protocol

Written process for when a specified product is unavailable:

  1. Contractor notifies homeowner in writing before substituting
  2. Contractor provides alternative product name, manufacturer, and emissions documentation
  3. Homeowner reviews and approves or rejects in writing
  4. Approved substitutions documented in the material log

No verbal substitution agreements. No "we used something equivalent" after the fact.

Option-Specific Differences

Each of the 7 build options has a dedicated spec pack because the material requirements differ:

How to Use the Spec Pack

  1. Purchase the $79 Build Package — includes all 7 spec packs plus the Decision Worksheet to identify your option.
  2. Complete the Decision Worksheet to narrow to 1–2 build options.
  3. Review the spec pack for your chosen option. Familiarize yourself with the material categories and prohibited materials.
  4. Include the spec pack in your bid request. Send it with your project drawings to 2–3 contractors. Their bids should reference the specification.
  5. Attach the spec pack to your contract. "Contractor will follow the attached material specification" in the contract language.
  6. Use the verification checkpoints during construction to confirm compliance.

What the Spec Pack Is Not